ADB Approves $200 Million Loan for Climate-Resilient Sewerage
The Asian Development Bank (ADB) has approved a $200 million loan to strengthen climate- and disaster-resilient sewerage and drainage infrastructure in Kolkata, enhancing the city’s livability and sustainability.
This initiative, part of the Kolkata Municipal Corporation (KMC) Sustainability, Hygiene, and Resilience (Sector) Project, aims to improve living conditions, public health, and flood resilience, particularly benefiting vulnerable groups, including women and children.
Addressing Kolkata’s Urban Challenges Kolkata, one of India’s most populous and densely populated cities, faces persistent urban flooding and sanitation issues due to inadequate drainage and sewerage systems. The situation is worsened by climate change, which has led to increased heavy rainfall and waterlogging.
The project will focus on: Expanding Sewerage & Drainage Networks
84 km of trunk and secondary sewerage pipelines 176 km of lateral sewerage pipelines, connecting households 50,000 new household sewer connections 1 sewage treatment plant and 5 pumping stations Enhancing Urban Resilience
Developing an IT-based asset management system for KMC Strengthening property tax revenue collection Expanding the early flood warning system from a previous ADB initiative Raising community awareness on water, sanitation, and hygiene (WASH) Empowering women through skills training and internships
About ADB The Asian Development Bank (ADB) is a leading multilateral institution dedicated to sustainable, inclusive, and resilient growth across Asia and the Pacific. Established in 1966, ADB is owned by 69 members, with 49 from the region. The bank leverages innovative financial tools and partnerships to build quality infrastructure, safeguard the environment, and transform lives.
Related Stories
Utilities being shifted to gear Joka Metro Work
The Kolkata Municipal Corporation (KMC) has started shifting sewer, water lines
50% security deposit to be paid before illegal construction hearing
KMC building department decides to direct case for special hearing
Rajarhat’s construction waste recovery plant to begin work in April
Plant will have the capacity to manage 500 tonnes of waste in a day
Page {{currentPage}} of {{pageCount}}
{{copy}}