3 firms in fray to develop Kalyan-Taloja metro line


The Mumbai Metropolitan Region Development Authority (MMRDA) is likely to choose from three firms for the civil construction work of much-awaited Metro Line 12.

The firms that have submitted their bids for the project are Gawar Constructions, J Kumar Infraprojects and Welspun Enterprises.

The Metro Line 12, which will run between Kalyan and Taloja, is a 20-km-long fully elevated metro corridor with 19 stations.

The stations covered are Klayan, APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavali, Dombivali MIDC, Sagaon, Sonarpada, Manpada, , Hedutane, Kolegaon, Nilje Gaon, Vadavali, Bale, Vaklan, Turbhe, Pisarve Depot, Pisarve, and Amandoot (Taloja).

It was in December 2023 that the MMRDA had invited tenders worth Rs 1,877 crore for part-design and construction of the elevated viaduct and 19 stations, with a completion time of 30 months.

As part of plan to create an inter-connected network, the Kalyan Taloja Metro Line 12 is set to feature interchange stations with Metro Line 5 at APMC Kalyan, as well as with Navi Mumbai Metro Line 01 at Taloja.

The Rs 8,416 crore Metro Line-5, spanning 24.9 kilometres and linking Thane to Kalyan through Bhiwandi, comprises a 15-station elevated corridor. Presently under construction, it is anticipated to commence commercial operations by 2025.

Related Stories

MMRDA to lease three BKC plots in Mumbai, raising Rs 6.56 billion

In the GTxT Block, a second plot measuring 10,026 square meters has been allocated.

J.Kumar Infra rises on securing LoA for road project in Thane

The value of the said contract is Rs 18.47 billion.

Thane-Bhiwandi Metro Line-5: MMRDA Achieves Milestone

It is with successful Erection Of Spans Over Majiwada Flyover.